Actualités

:: Fourth railway package – Commission proposals of 2013

Fourth railway package – Commission proposals of 2013

All details on :

https://ec.europa.eu/transport/modes/rail/packages/2013_en.htm

:: Upcoming trade fairs

Upcoming trade fairs:

 

:: Entities in charge of maintenance (ECM)

Entities in charge of maintenance (ECM):

30-08-2013 : publication of the Guide for the application of the Art 14 (a) of the Safety Directive and Commission Regulation (EU) No 445/2011 on a system of certification of entities in charge of maintenance for freight wagons

see:

https://www.era.europa.eu/Core-Activities/Safety/Regulatory-Framework/Pages/Certification-of-entities-in-charge-of-maintenance.aspx

Valunorm
Vossenlaan 27
B-3080 Tervuren Belgium
Tel: +32 (0) 473 634 795

agoria
 

Systèmes de Management intégrés

pyramide PDCA jpeg 2

Objectifs de Valunorm

  • Eviter les redondances entre les différents systèmes ISO 9001, IRIS, ISO 17025, EN 9100, ISO/TS 16949, ISO 14001, OHSAS 18001, etc. grâce à l’identification des recouvrements entre les normes :

voir: 

-       cartographie de comparaison entre IRIS, ISO 9001 et EN 9100 :  Diapositive6 

-       cartographie entre IRIS, ISO 9001 et ISO/TS 16949 :  Diapositive1 

  • Faire en sorte que les nouveaux processus/documents apportent une valeur ajoutée intrinsèque pour le client
  • Eviter le surplus de documents : pas de sur-documentation

  

Services Valunorm 

  •  Formation et analyse de l’écart sont réalisées de manière concomitante
  • Mise en place des éléments manquants (processus, procédures, formulaires) : rédaction en sessions de groupe ou le travail est réalisé en temps réel : voir Méthode_de_Travail
  • Les normes sont mises en place en suivant une approche Processus
  • Audits de préparation